登入 加入會員 求助
 
Sunzo Foundation Engineering Co.,Ltd.
 
 
Recommended Results 
 
Construction Of Soft Soil Improvement by Vacuum Preloading 

  產品分類 : 家具及木材->衛浴設備->落水地板片

     
Construction Of Soft Soil Improvement by Vacuum Preloading
 
 
       

  產品規格
 
  Country  CN
  Brand  Sunzo
  Packing  Plastic bag package,200m/roll,Diameter0.8-1.3m,height0.1m, 130,000m/40'HQ.
  Minimum Order  10000 square metres
  Payment Term  TT

 

  產品描述
   
  Construction Of Soft Soil Improvement by Vacuum Preloading
The use of prefabricated vertical drains with preloading is now common practice and is proving to be one of the most effective ground improvement techniques known.
Preloading of soft clay with vertical drains is one of the most popular methods used to increase the shear strength of soft soil and control its post-construction settlement. Since the permeability of soils is very low, consolidation time to the achieved desired settlement or shear strength may take too long. Using prefabricated vertical drains (PVDs), means that the drainage path is shortened from the thickness of the soil layer to the radius of the drain influence zone, which accelerates consolidation. This system has been used to improve the properties of foundation soil for railway embankments, airports, and highways.
Over the past three decades the performance of various types of vertical drains, including sand drains, sand compaction piles, prefabricated vertical drains (geosynthetic) and gravel piles, have been studied. Prefabricated band shaped drains and cardboard wick drains for ground improvement. Typically, prefabricated band drains consist of a plastic core with a longitudinal channel surrounded by a filter jacket to prevent clogging. Most vertical drains are approximately 100 mm wide and 4 mm thick.
To study consolidation due to PVDs, unit cell analysis with a single drain surrounded by a soil cylinder has usually been proposed. PVDs under an embankment not only accelerate consolidation, they also influence the pattern of subsoil deformation. At the centre line of an embankment where lateral displacement is negligible, unit cell solutions are sufficient but elsewhere, especially towards the embankment toe, any prediction from a single drain analysis is not accurate enough because of lateral deformation and heave.

Construction Of Soft Soil Improvement by Vacuum Preloading


  其他類似產品
 
Wick Drain Factory, Vertical Wick Drain For Sales

Wick Drain Factory, Vertical Wick Drain For Sales
Soft Soil Foundation Improvement Constuction Company

Soft Soil Foundation Improvement Constuction Company
Manufacturers Of Prefabricated Vertical Drain(Wick Drain)

Manufacturers Of Prefabricated Vertical Drain(Wick Drain)
Wick Drain Installation, PVD Construction, PVD Installation

Wick Drain Installation, PVD Construction, PVD Installation
 
   


[ Back Products Catalog ]

Commerce 會員:
請登入您的 帳號 跟 密碼, 系統將自動為您填入您的相關基本資料!
 
帳號:
密碼:
記住我的帳號
 
 
填寫下列表格並寄送詢問函.所有的詢問信函將會自動寄發給你想聯絡的公司
主旨
內容 ﹙ 請勿輸入公司名稱、Email、電話、傳真、網址 ﹚
   

 


公司簡介:

*公司名稱
*E-mail
*國家
*聯絡人
網址
*電話
- -
傳真
- -
*郵遞區號
*城市
*街道地址
*企業形態
批發商   出口商 進口商 製造商
大盤商 零售商  代理商 Retrofitter 使用者
其他, 請詳細說明:
*安全密碼
請輸入所顯示的安全密碼


網站導覽 l 隱私權政策 l 服務團隊 l 合作提案 l 聯絡我們 l 幫幫我 l 廣告刊登 l  B2B商業夥伴
    .